The engine, EFI, cooling system and rear suspension are in place. UPS owes us a lot of goodies and we should have a lot of bespoke parts headed our way. Hang tight, we'll be riding in a month. That means some sick new YouTube videos and some knee dragging action shots. Ok enough of that, back to the drawing board (or 37" CAD screen) to put the final details on the uprights before we send them to Southern Machining.
